Chimney cleaning and smartscan flue liner inspection - proposal for a new chase cover
Tuck pointed joints on stone work
Finishing zero clearance fp install
Installed ventis forever fireplace
Installed class A piping
Installed stone veneer with a hearth and mantel
Installing stone veneer
Installed stone veneer and prepped for finishing
Continued stone installation
Preparing for stone work
Prepped chimney for stone veneer install
Installed new insert and framed dura rock, as well as began class A pipe installation
Installed fireplace and prepared for lining system
Installed insert and prepped for new class A lining system
Installing ventis forever fireplace